Last week we met up with out site supervisor to check on the progress.
To our shock and horror the wrong basins, taps, toilets & a shower niche is missing in the main bathroom...
Site manager explains that he only put in whats on the paper work and I would have to chase it up
with admin/head office.
I promptly go home and check through our "Final Variation" the "Contract" and "the 123 promo brocher" which ALL say I should have the other basins, taps, toilets & a shower niche in the main bathroom...the ones I chose!
However a error with admins paperwork has resulted in all the above being put in wrong!
It took a further week and a half for admin to raise a "building variation"....after myself phoning the manager of EB homes in absolute annoyance at certain admin staff.
Thankfully he was able to get the building variance risen in less then 5 hrs, not 9 days!!!
They couldnt get the shower niche in the main bathroom, so I missed out on that as to re open the whole shower up, break the water sealing it would have been more hassle/ worry down the track then its worth! We got a credit back on it.
Now we are put back 2 weeks, while the toilets get swapped around, the bathroom bench tops and basins are replaced, and all the tap wear! Such a hassle, the tiler, the shower screen guy, the plumber and the painter all called back in! For a simple admin error. Not happy. I will be happy if it all takes no more then 2 weeks.
Main bathroom shower, wrong taps, however right shower rose...
Bathroom taps are supposed to be a spout and a flick mixer
Basin is supposed to be the risen basins, and a flick mixer tap