House Final Pics

Hi all, its been a while, very busy, only just got the internet on, Thanks Telstra....thats another story/blogg...
We got the keys early July, after the mess up with the bathroom fittings sorted, lost 3 weeks over that.
We still have a couple of things they need fixing and will be fixed on the 13 week inspection....they say, see how we go.
 Our daughter opening the front door for the 1st time
Front study
Main bedroom
Main bedroom
                                                Ensuite
                                Dining & open plan living area

                   ensuite bathroom


Back rumpus room
Main bathroom
Daughter bedroom - back
Hallway to front door

1 comment:

  1. This is a long shot. Just wondering if you would still have any left over tiles from your main bathroom? (30 x30 Mercedes Travertine Mocha) We used the same tile for ensuite and need to redo our shower, however we only have 6 tiles of this particular one...plenty of the other tiles used throughout, go figure. DiLorenzo no longer have any stock. If you do still have any and are interested in selling them please let me know :)